90 workorders
Label
Days open
Planner
Type
Priority
User Status
ABC indicator
Functional location
WO#DescriptionAI ReasoningLabelUser StatusPlannerDecision

Replace lamp fitting — corridor B

Equipment scope superseded by area lighting renewal project

Close workorderPlannedS. de VriesClose

Inspect tank T-401 (decommissioned)

Equipment no longer exists — close as obsolete

Close workorderNewT. HoekstraClose

Calibrate transmitter PT-9920 (removed)

Functional location decommissioned — recommend close

Close workorderNewM. BakkerClose

Lubrication round — old packaging line

Close workorderNewR. JanssenClose

Repair access ladder — vessel V-810 (replaced)

Close workorderPlannedT. Hoekstra

Drain piping clean — area 7 (line removed)

Close workorderNewL. Visser

Insulation strip — line 22A (rerouted)

Close workorderNewJ. de Boer

Calibrate flow meter FT-9912 (decom)

Close workorderPlannedM. Bakker

Replace gasket — Pump P-1102A

Final confirmation entered but user status still 'Work in Progress' — recommend TECO

Work completedWork in ProgressR. JanssenClose

Replace mechanical seal — Pump P-3304

TECO step missed — work executed but order not closed

Work completedWork in ProgressR. JanssenClose

Globe valve overhaul — KITAMURA EO126M

1100+ days in execution — clear process failure

Work completedWork in ProgressT. HoekstraClose

Repaint stairway platform 4B

Work completedScheduledT. Hoekstra

Repair handrail — walkway 7N

Work completedPlannedT. Hoekstra

Earth bonding test — substation B

Work completedNewS. de Vries

Bearing replacement — Fan F-1102

Work completedPlanning in ProgressR. Janssen

Replace fuses — MCC panel 12

Work completedNewS. de Vries

Insulation jacket repair — line 5C

Work completedPlannedJ. de Boer

Cleaning round — heat exchanger E-201

Work completedScheduledL. Visser

Replace gauge — drum D-105

Work completedNewM. Bakker

Vibration check — rotating area 3

Work completedPlannedR. Janssen

Annual PM — Compressor K-105 (skipped 2025)

PM cycle skipped during last turnaround

Skipped PMNewR. JanssenKeep Open

6-month inspection — vessel V-2208

Skipped PMNewT. HoekstraKeep Open

Quarterly calibration — analyser GC-04

Skipped PMPlannedM. Bakker

Lubrication route — pump cluster A

Skipped PMNewR. Janssen

PM grease bearings — fan deck 4

Skipped PMNewR. Janssen

Missed PM — heat exchanger E-302 cleaning

PM date passed without execution

Missed PMNewL. Visser

Missed PM — earth fault test substation 3

Missed PMPlannedS. de Vries

Missed PM — pressure relief valve test SV-3302

P1 PM overdue — safety implication

Missed PMNewT. Hoekstra

Missed PM — flow meter verification FT-0812

Missed PMNewM. Bakker

Monitor leak — flange 14B

Monitored without action for 2+ months

Monitor situation > 2 wksNewT. Hoekstra

Monitor vibration — Pump P-2210B

In execution but only monitored — clarify scope

Monitor situation > 2 wksWork in ProgressR. JanssenKeep Open

Monitor noise — Compressor K-301

Monitor situation > 2 wksPlannedR. Janssen

Monitor temp drift — heat exchanger E-1503

Monitor situation > 2 wksNewT. Hoekstra

Monitor cable temperature — sub D

Monitor situation > 2 wksScheduledS. de Vries

Monitor insulation surface — line 8A

Monitor situation > 2 wksNewJ. de Boer

Monitor cleaning effectiveness — strainer F-0701

Monitor situation > 2 wksNewL. Visser

Monitor calibration drift — TT-1207

Monitor situation > 2 wksPlanning in ProgressM. Bakker

Temporary clamp — line 22A leaking flange

Temporary fix in place 9+ weeks

Temporary solution > 3 wksPlannedT. Hoekstra

Temporary cable bypass — MCC 12 (panel)

Temporary solution > 3 wksNewS. de Vries

Temporary insulation patch — heater H-302

Temporary solution > 3 wksNewJ. de Boer

Temporary instrument loop bypass — TT-1407

Temporary solution > 3 wksPlannedM. Bakker

Temporary discharge hose — Pump P-4407

Temporary solution > 3 wksNewR. Janssen

Temporary catch-tray — drain line valve 7

Temporary solution > 3 wksNewL. Visser

Punch list close-out — TA 2024 unit 3

Punch items leftPlannedT. Hoekstra

Punch items — overhaul Pump P-1105A

Major work complete — only labels remaining

Punch items leftWork in ProgressR. Janssen

Punch items — turnaround box V-1408

Punch items leftNewT. Hoekstra

Punch items — substation 3 commissioning

Punch items leftScheduledS. de Vries

Punch items — instrument loop tuning area 6

Punch items leftPlannedM. Bakker

General materials request — area 4

General WO > 1 moNewT. Hoekstra

General WO — area 7 housekeeping bulk

General WO > 1 moNewL. Visser

General WO — spares stocking E1 panel

General WO > 1 moPlannedS. de VriesTo Review

General WO — instrument tubing renewal

General WO > 1 moNewM. Bakker

General WO — gasket bulk order

General WO > 1 moNewT. Hoekstra

General WO — bearing bulk replacement program

General WO > 1 moPlannedR. Janssen

General WO — insulation refurb planning

General WO > 1 moNewJ. de Boer

Annual inspection — vessel V-1408

Open >180d with no recent updates

No updates after creation > 3 mosPlannedT. HoekstraTo Review

Calibrate flow meter FT-0405

No updates after creation > 3 mosNewM. Bakker

Inspect crane structural — gantry G-3

No updates after creation > 3 mosNewT. Hoekstra

PM lubrication — Crusher CR-101

No updates after creation > 3 mosNewR. Janssen

Earth bonding test — substation B

No updates after creation > 3 mosPlannedS. de Vries

Cable insulation resistance test area 5

No updates after creation > 3 mosNewS. de Vries

Cleaning audit — chemical area

No updates after creation > 3 mosNewL. Visser

Insulation thermography — line 14

No updates after creation > 3 mosNewJ. de Boer

Inspect pipe support — rack area 2

No updates after creation > 3 mosPlannedT. Hoekstra

Functional test ESD valve XV-2201

No updates after creation > 3 mosNewM. Bakker

Bearing inspection — pump cluster B

No updates after creation > 3 mosNewR. Janssen

Drain trace heating check — line 9

No updates after creation > 3 mosNewJ. de Boer

ROTOR ELLIOT 6MD3-3 1 STAGE FOR COMPR

1500+ days in execution — major process failure

Partly executedWork in ProgressT. Hoekstra

X6D202 C2H4 UITLAAT 16H501A

Scheduled status held >3 years

Partly executedScheduledT. Hoekstra

PSV3160 turbine X311B

Long-running execution — review stalled

Partly executedWork in ProgressM. Bakker

K6401B auxilliaries inspection

Partly executedScheduledR. Janssen

P801B distillation pump partial overhaul

Partly executedScheduledR. Janssen

Globe valve 3IN partial repair

Partly executedWork in ProgressT. Hoekstra

Heat exchanger E-202 — partial cleaning

Partly executedPlannedL. Visser

Tank T-503 inspection — partial

Partly executedNewT. Hoekstra

Cable replacement — sector 7 partial

Partly executedPlannedS. de Vries

Instrument loop check — half completed

Partly executedNewM. Bakker

Insulation patch repair series — line 14

Partly executedNewJ. de Boer

Pump alignment series — area 4 (3/5 done)

Partly executedScheduledR. Janssen

V-belt replacement Fan F-2104 (dup of WO 4002115)

WO 4002115 covers same scope, completed Q3 2024

DuplicationNewR. Janssen

Inspect motor M-1108 (dup WO 4003221)

Active WO 4003221 covers identical scope

DuplicationNewS. de Vries

Bearing greasing route 5 (duplicate)

DuplicationPlannedR. Janssen

Calibration TT-2204 (dup of TT-2204A)

DuplicationNewM. Bakker

Cleaning sequence area 3 (duplicate)

DuplicationNewL. Visser

Replace expansion joint — line 14B

No planning recorded since creation

Nothing done yetNewT. Hoekstra

Bearing housing replacement P-4407

Nothing done yetNewR. Janssen

Cable termination check — sub D

Nothing done yetNewS. de Vries

Insulation removal & replacement — line 7

Nothing done yetNewJ. de Boer

Annual TA prep — vessel V-2208

Scheduled in TA 2026

PM is set for futureNewT. Hoekstra

Future PM — compressor K-105 5-year overhaul

PM is set for futureNewR. Janssen